Built Right with Old School Values
Over the years, Clearfield Construction has established a track record of successful projects throughout San Antonio, TX, and the rest of Bexar County. Take a look at some examples of our recent work for major clients, including municipalities and government buildings.
Johnson High School On-Site Detention Basin Project
– Owner-NEISD
-Excavation, build two detention basins, install irrigation system, pump system and electrical work
Lee high School Front Parking Lot Projec
- Owner-NEISD
-Concrete work, sidewalks, asphalt parking lot, landscape installation
NISD Paving & Drainage Upgrades at Hobby and Luna Middle Schools
– Owner-NISD
- Re-built two parking lots, excavation, landscape and drainage ditch installation
Lower Brushy Creek Watershed Retarding Structure Repair
- Owner-Lower Brushy Creek WCID
- Repair of two dams, floodwater retarding structures, excavation and earth fill
2017 Street and Drainage Maintenance for the City of Olmos Park
– Owner-City of Olmos Park
- Cutting and replacing pavement, mill and overlay and French drain
Parkview Estates Drainage Improvements Phase 12
- Owner-City of Universal City
- Concrete retaining walls, concrete riprap, privacy fence and chain link fence
Rattler Road Improvements
– Owner-Hays County
- Install drainage channels, concrete driveways, culverts and asphalt road
NASCC (Naval Air Station Corpus Christi) Gence Replacement Project
- Owner-City of Corpus Christi
- Clearing vegetation from site, setting new fence and gate posts in concrete footings, installing new chain link fence fabric and barbed wire extension, construct minor storm water improvements and security gates
Construction of Leander Trail
– Owner-Capital Metropolitan Transportation Authority
- Construct 10 ft wide concrete trail and associated pedestrian bridge, and lighting
Concepcion Creek Outfall Repair
- Owner-San Antonio River Authority
- Removed damaged slope paving, installed soil nails to increase stability of slope, installed new concrete slope paving and baffle blocks, placed riprap erosion protection downstream of outfall
Forest Meadow Drainage Improvements
– Owner-City of Leon Valley
- Improved storm drainage in park area, landscaping and irrigation.
Shooting Range French Drain
– Owner-Alamo Colleges
- Installed French Drain around shooting range for First Responders Unit
Drainage Upgrades at Helotes Elementary School
- Owner-NISD
- Improved storm drainage in courtyard, concrete sidewalk, curbs, railing and landscaping.
Clearfield Construction
5150 Broadway #170
San Antonio, TX 78209
Hours of Operation
Monday-Friday: 8 AM - 5 PM
Disadvantaged Business DBE:
213071660
ESBE, HABE, MBE, SBE:
213071660
HUB:
1462711663600
EPA
Environmental Training Program Certification
AGC San Antonio Chapter and Bexar County - Basics
NAICS:
236220: Project Management, Construction Management, Commercial and Institutional Building
OSHA 7405
Fall Hazard Certification