Project Gallery

Built Right with Old School Values

(210) 320-2377

A History of Excellence

Over the years, Clearfield Construction has established a track record of successful projects throughout San Antonio, TX, and the rest of Bexar County. Take a look at some examples of our recent work for major clients, including municipalities and government buildings.

Bexar County - Bullis Park Waterline Extension

City of San Antonio - BES Sidewalks & Drainage

George West ISD – George West HS North Parking Lot

North East ISD – Dellview Elementary Drainage Channel and Headwall

Live Oak County – Courthouse Flooring Improvements

City of San Antonio - Alamodome Pavers

Texas Parks and Wildlife Dept. – Government Canyon Flood Control – retaining wall and porous pavement trails

City of Somerset – Drainage, boring headwall, and paving Dixon and Touchstone Streets

City of San Antonio – Alamodome Paver Installation 

San Antonio Housing Authority – Lift Station and Sewer Line Replacement

Schertz Cibolo Universal City ISD – Wiederstein Elementary Perimeter Fence

San Antonio Water Systems - Medio Creek Carousel Bridge Replacement – Site and concrete work

Port Authority San Antonio – Test Cell Flood Protection – Retaining walls and piers




Johnson High School On-Site Detention Basin Project 

– Owner-NEISD

-Excavation, build two detention basins, install irrigation system, pump system and electrical work




Lee high School Front Parking Lot Projec

- Owner-NEISD

-Concrete work, sidewalks, asphalt parking lot, landscape installation




NISD Paving & Drainage Upgrades at Hobby and Luna Middle Schools

– Owner-NISD

- Re-built two parking lots, excavation, landscape and drainage ditch installation




Lower Brushy Creek Watershed Retarding Structure Repair

- Owner-Lower Brushy Creek WCID

- Repair of two dams, floodwater retarding structures, excavation and earth fill




2017 Street and Drainage Maintenance for the City of Olmos Park

– Owner-City of Olmos Park

- Cutting and replacing pavement, mill and overlay and French drain



Parkview Estates Drainage Improvements Phase 12

- Owner-City of Universal City

- Concrete retaining walls, concrete riprap, privacy fence and chain link fence




Rattler Road Improvements

– Owner-Hays County

- Install drainage channels, concrete driveways, culverts and asphalt road



NASCC (Naval Air Station Corpus Christi) Gence Replacement Project

- Owner-City of Corpus Christi

- Clearing vegetation from site, setting new fence and gate posts in concrete footings, installing new chain link fence fabric and barbed wire extension, construct minor storm water improvements and security gates


Construction of Leander Trail

– Owner-Capital Metropolitan Transportation Authority

- Construct 10 ft wide concrete trail and associated pedestrian bridge, and lighting



Concepcion Creek Outfall Repair

- Owner-San Antonio River Authority

- Removed damaged slope paving, installed soil nails to increase stability of slope, installed new concrete slope paving and baffle blocks, placed riprap erosion protection downstream of outfall




Forest Meadow Drainage Improvements

– Owner-City of Leon Valley

- Improved storm drainage in park area, landscaping and irrigation.

Shooting Range French Drain

– Owner-Alamo Colleges

- Installed French Drain around shooting range for First Responders Unit

Drainage Upgrades at Helotes Elementary School

- Owner-NISD

- Improved storm drainage in courtyard, concrete sidewalk, curbs, railing and landscaping.

Other Clearfield Construction Projects

Contact Us Today

Count on our company’s proven expertise when you’re searching for a construction partner. Give us a call today to get the ball rolling on your next large-scale operation.

Share by: